Guadalupe River

Guadalupe River Flood Control Remediation


In preparation for the construction of a flood control channel for the Guadalupe River by the Army Corps, the SCVWD required that contamination from industrial operations be remediated.  The project included the demolition of five buildings, excavation and disposal of 9,000 tons of Class 1 and Class 2 waste soil, shoring to enable excavation to 25 feet, and complete grading of the property. All work was closely supervised by the environmental consultant.